China Xinfeng Thermal Power Plant Project     China Lu’an Yuwu Thermal Power Plant Project
Location : Fengzhen, Inner Mongolia, China     Location : Changzhi, Shanxi, China
Boiler Capacity: 2X300MW     Boiler Capacity : 2X135MW
Dust-removal System : Feida EFF     Dust-removal System :Feida EFF
Gas Volume : 2.230,000 m3/h     Gas Volume : 804,000m3/h
Start-up :2006     Start-up : 2007
       
   
SINOPEC Shanghai Petrochemical Company     China Jingneng Thermal Power Plant Project
Location : Shanghai, China     Location: Beijing, China
Boiler Capacity : 1X200MW     Boiler Capacity: 1X 200 MW
Dust-removal System : Feida EFF     Dust-removal System: Feida FF FF (retrofitted from ESP)
Gas Volume : 1,001,000 m3/h     Gas Volume: 1,800,000 m3/h
Start-up :2007     Start-up : 2010